Permitting a roaster in the U.S. is mostly about smoke. Here is how we help you pass.

Yoshan factory customer visits

Most U.S. roasteries above ~1 kg need some form of emissions control to satisfy their local air-quality district and fire code. Yoshan supplies the abatement equipment matched to your roaster and your jurisdiction.

Afterburner vs. ESP — Which Do You Need?

Thermal Afterburner ESP Smoke Filter
How it works Combusts smoke/VOCs at 200–1,000°C Electrostatically captures 95%+ particulate
Best for Strict VOC/odor districts (e.g. CA AQMDs) Particulate limits, residential-adjacent
Running cost Higher (burns gas) Lower (electric)
Roaster size 1 kg – 300 kg 1 kg – 300 kg

What U.S. Permitting Usually Involves

  • Local air district permit — many districts require an afterburner or equivalent above a roast-capacity threshold
  • NFPA 86 — fire code for ovens/furnaces; covers gas trains, purge and safety interlocks
  • Mechanical / ventilation permit — exhaust ducting and make-up air
  • Gas connection — NG meter upsize or propane tank sizing

We are a manufacturer, not a permitting consultant — but we have shipped to 30+ countries and will configure the burner, gas train and abatement so your local mechanical engineer has what they need. Tell us your city and we’ll advise on the right setup.

Planning a roaster install?

Send us your location and target capacity — we’ll spec the roaster plus the right emissions package.

Talk to an Engineer